On a large property the installation decision is mostly about distance: how far hot water travels and how much is lost on the way. Capacity per building and the length of the run matter more than the total size of the plant.
Design before equipment
Which fixtures each unit serves, their peak simultaneous demand, and how long the pipe run is. A distant wing with one bathroom is rarely served well by the main house's tank.
Venting
Roof geometry constrains vent length and termination. On complex roofs the compliant route is sometimes not the obvious one, and that is settled before equipment is ordered.
Supply
Gas pipe sizing over long runs, or circuit capacity for electric and heat-pump units, determines what each building can support. A condensing unit also needs a condensate path.
Types
Storage suits a building with space and steady demand. Tankless suits a distant wing or continuous use, with venting and descaling as the trade. Heat pumps need air and typically a circuit.
Handover
The County permits a new installation or change of type. At handover the unit runs, the temperature is set, the shut-offs and relief valve are shown, and the descaling interval for this water is explained.